Commercial
Leasing Specifications
All retail and professional space
in the Phase II Building can be subdivided depending on a tenant’s
needs and the remaining availability of space. The total leaseable
square footage of the retail and professional space is 13,333 sq.
ft. and 26,667 sq. ft., respectively. The building has the following
specifications:
Structure: Masonry exterior
walls with steel frame and glass storefront.
Roof Construction: Standing seam metal roofing over rigid insulation on metal decking on open web steel joists.
Floor Construction: First
floor - concrete slab on grade. Second and third floors - concrete
slab on metal decking on open web steel joists. All floors will
be designed for live loads of 100 lbs. per square foot and will
be ready for carpet or tile (by tenant). Galleria common area washrooms on
second and third floors will be tiled. The common area hallways
on the second and third floors will be carpeted. Tenant to provide
their choice of flooring and wall base within their own unit.
Ceiling Construction: Standard
ceiling grid and panels to be provided by Landlord. Ceiling height
to underside of steel joists will be 11 feet. Ceiling height to
underside of mechanical ducts will vary from a minimum of 9 feet.
Suspended ceiling to be 10 feet maximum above the floor.
Retail Storefront: Exterior
storefront windows will be aluminum frames with 1" insulated
clear glazing and high performance paint finish. Interior storefronts
will be either steel or aluminum frame with a high performance paint
finish. Refer to architectural plans for entrance locations. All
storefronts and entrances will be provided by Owner.
Windows: Non-operable anodized
aluminum frames with 1" insulated glazing on the first floor
and semi-operable windows on the second and third floors.
Restroom Facilities: The
second and third floors will be provided with public toilet facilities.
Private toilet facilities may be installed by tenant.
Demising Partition Construction:
Demising walls consisting of masonry concrete block or 5/8"
gypsum board on metal studs with acoustical insulation. All gypsum
board is taped and sanded and ready for tenant’s finish. Tenant
to provide interior partition walls.
Lighting: Standard Fluorescent
lighting to be provided by Landlord.
Parking: Due to the Special
Use District (SUD) Agreement, all parking lots of adjoining neighbors
must be connected and therefore ample parking is provided in excess
of the minimum requirement.
Service Entry: There will
be no dedicated service entry. Service will be by tenants storefront,
or Galleria entrance.
Exterior Tenant Building Signage:
Exterior Building Signage will be allowed for the first floor retail
tenants. Tenant will be required to conform to a signage code specifying
size, location, and allowable materials and will be provided by
the tenant.
Monument Signage: A monument
sign will be placed at the center of the Phase II lot along U.S.
Route 30. Space for each tenant’s name will be provided subject
to slot availability at the tenants cost.
Refuse Disposal: A trash
container will be provided by the Landlord and located at the northeast
corner of the parking lot. Tenants will be responsible for removing
trash from the building and placing it in the container.
Security Deposit: One months
rent.
Doors: Exterior door and
lock to be provided by the Landlord, interior doors and locks to
be provided by tenant.
Utilities: Utilities will
be metered separately to each tenant where possible.
Electrical: Landlord will
bring electrical service to each individual unit and will provide
standard outlets.
|